Сербский поток

 project clock Work has been underway since 2018 to the present.
 project pipe More than 15 thousand units of materials and equipment were inspected for the Project.

For the purposes of Project implementation, BT GROUP performs:

  • Audits of manufacturers;
  • Quality control of materials & equipment production;
  • Surveying support;
  • Inspection of pipe loading at temporary storage bases;
  • Incoming control of materials and equipment at the construction site

Range of inspected equipment:

  • Pipe products and pipeline fittings;
  • Pipeline valves;
  • Metering units;
  • Pig traps;
  • Gas-measuring stations;
  • General industrial equipment.