Сила Сибири

 project clock Works have been performed from 2016 to the present time
 project pipe As part of the Project we have inspected more than 656 thousand tons of rolled steel and 1116 thousand tons of pipes, including pipes with concrete coating, more than 40 thousand units of other types of materials and equipment

In terms of Project implementation, BT GROUP provides comprehensive inspection support for the Project, from pipe manufacture control (starting with plate production inspection) to construction control at installation sites (offshore and onshore parts of the Project).

  • Inspection during production;
  • Inspection in the port;
  • Technical and expert HSE support at suppliers ' production sites;
  • Consulting support in terms of conformity assessment in the EEU, explanation of all requirements of the Russian certification system for equipment and products planned for delivery to the Russian Federation for the needs of the Project;
  • Construction control of the construction process.